My documents
EN
  1. Home
  2. Contractor quote
Free · no sign-up · no watermark · no limits

Contractor quote template

Price a remodel or repair with clear line items, allowances, a payment schedule and a valid-until date. When the customer says yes, the estimate becomes your first invoice.

What do you want to make?

What do you want to make?
About a minute · nothing is uploaded
Your data stays on this deviceNo sign-upNo watermark

What a contractor estimate needs to win the job

Homeowners usually compare two or three bids. The one that is easiest to understand often wins, even when it is not the cheapest. A clear contractor estimate shows the scope room by room, separates labor from materials, names the allowances, and tells the customer exactly when they pay and how long the price holds.

In the US the editor titles the document “Estimate”. The sample above shows a small remodel; replace the lines with your own and save the ones you use often.

  • Your license number and insurance details. Many states require the license number on bids and contracts. Check your state licensing board.
  • Scope of work in plain language, plus what is excluded (for example, “No work on existing electrical panel”).
  • Line items with quantity and unit: sq ft of tile, linear ft of trim, each for fixtures, lump sum for demolition.
  • Allowances for items the customer will choose later.
  • Permits, dumpsters and disposal as separate lines.
  • Payment schedule tied to milestones.
  • Valid-until date and a place for the customer to sign.

Example: bathroom remodel estimate

All prices are editable examples.

Line Qty Unit Rate Amount
Demolition and haul-away 1 lump sum $1,800.00 $1,800.00
Plumbing rough-in, licensed sub 1 lump sum $3,200.00 $3,200.00
Tile installation, floor and shower 120 sq ft $22.00 $2,640.00
Tile material allowance 120 sq ft $8.00 $960.00
Vanity, toilet, fixtures allowance 1 lump sum $2,600.00 $2,600.00
Electrical: exhaust fan, GFCI outlets 1 lump sum $1,150.00 $1,150.00
Glass shower door, installed 1 each $1,600.00 $1,600.00
Drywall repair, paint, trim 1 lump sum $2,450.00 $2,450.00
Building permit 1 each $600.00 $600.00
Project management and final cleanup 1 lump sum $1,400.00 $1,400.00
Estimate total $18,400.00

Deposit and payment schedule

A payment schedule protects both sides: the customer never pays far ahead of the work, and you are never far behind. Some states limit the deposit on home-improvement contracts. In California it is capped at 10% of the contract price or $1,000, whichever is less (Bus. & Prof. Code § 7159), so on this job the maximum deposit is $1,000. Check your own state’s rule.

Payment When Amount
Deposit At signing $1,000.00
Progress 1 Demolition done, rough-in inspection passed $7,000.00
Progress 2 Tile and fixtures installed $7,000.00
Final Punch list complete $3,400.00
Total $18,400.00

Write the schedule into the notes so it prints with the estimate.

Change orders and sales tax

Hidden rot behind the tub is a fact of remodeling. Say in the notes how you handle it: work stops, you write a change order with the price, and the customer signs before you continue. That one sentence prevents most end-of-job disputes.

Sales tax treatment of labor and materials varies by state. If your state taxes materials, set the rate on those lines; the editor totals each rate separately.

From signed estimate to invoice

Download the estimate, share it, and mark it sent. When the customer signs, choose “Accepted? Turn it into an invoice” on the estimate. The client and lines are copied into a new invoice; edit it down to the deposit for the first bill. Later invoices can be made with Duplicate. When the final payment arrives, mark it paid and create a receipt.

Want the customer’s signature line to carry yours too? Make one with the signature generator. Billing the job? See the contractor invoice template. Specialized estimates: roofing, HVAC and construction. General quotes for any business live on the quote template page.

Frequently asked questions

What is the difference between a quote and an estimate?
In everyday use, an estimate is your best guess and may change; a quote is a firm price for a defined scope. Contractors often use the words loosely. Whichever you call it, say in the notes whether the price is fixed and what would change it. Our quote vs estimate guide explains more.
How long should a contractor estimate be valid?
Fifteen to thirty days is common, because lumber, copper and other material prices move. Set the valid-until date in the editor so it prints on the estimate. If the customer comes back after it expires, reprice before you accept.
What are allowances on an estimate?
An allowance is a budget for items the customer has not chosen yet, like tile, fixtures or lighting. Write the amount and what happens if they choose something cheaper or more expensive, for example “Fixture allowance $2,600; difference billed or credited at cost.”
Do I need the customer's signature on the estimate?
A signed estimate is the clearest proof that the customer accepted the scope and price. Many states also have specific contract requirements for home-improvement work, such as written contracts, cancellation notices and license numbers. Check your state's rules; the estimate does not replace a required contract.
How do I turn the accepted estimate into an invoice?
Choose “Accepted? Turn it into an invoice” on the estimate; it is also listed in My documents with its status. The client and line items are copied into a new invoice with its own number. For progress billing, edit the quantities to bill only the first payment.

Related

Settings

NecessaryRemembers your choices and keeps your documents in this browser. Always on.
Always on